Home
MavelUzbekistan

PPP & partnership

Small hydro. Serious framework.

Uzbekistan has the water, the legal framework and the financing programmes. We bring the machines and the engineering to build on all three.

The opening

Electricity demand is set to double by 2030 while three quarters of the country's hydro potential still flows unused. The state has answered with law, targets and money:

ZRU-573

PPP Law in force since June 2019 — with PPP units inside the Ministry of Energy

25 yr

PPA terms with guaranteed offtake, proven in Uzbekistan's solar and wind IPPs

$150M

World Bank programme for 100 kW–5 MW plants on irrigation canals, 2025–2030

2 983

micro-HPP sites in the national 2025–2026 programme (~165 MW combined)

Where Mavel machines fit

93% of the canal sites identified in Uzbekistan fall in the 100–1 000 kW range with low heads — precisely the territory of Kaplan S/PIT units and TM siphon packages. For mountain rivers in Tashkent, Namangan and Surkhandarya regions, Francis and Pelton units cover heads to 1 000 m.

Who we work with

01

EPC contractors

Complete water-to-wire equipment packages with guaranteed interfaces, factory testing, installation supervision and commissioning — your schedule risk contained.

02

Public institutions

Technical documentation, feasibility input and European-manufactured equipment with ISO 9001/14001 certification for modernization and new-build programmes.

03

Developers & investors

Turbine selection and energy-yield calculations from your site data, budgetary pricing for bankable feasibility studies, and O&M support for the PPA term.

From site data to first kilowatt-hour

  1. 01

    Site data

    You send head, flow series and site photos — we confirm turbine type and unit sizing.

  2. 02

    Feasibility

    Energy yield, equipment scope and budgetary pricing for your financial model.

  3. 03

    Contract & engineering

    Binding proposal, hydraulic design, civil-works interfaces for your EPC.

  4. 04

    Manufacturing

    Production and full assembly testing in the Czech Republic. Every unit test-run before shipment.

  5. 05

    Commissioning

    Installation supervision, grid connection, trial operation and operator training.

  6. 06

    Operation

    Remote monitoring, spare parts and service support — for the life of the PPA.

Bring us a site — or a portfolio

From a single canal drop to a regional programme: we'll match the machines to the water.

Discuss a project